TMC Instrumentation Brochure
Unit Cabins
Land Based Mudlogging Unit - Exterior
Land Based Mudlogging Unit - Exterior

8'x25' Laboratory trailer with living quarters for up to 4 people, 5 work stations, 3 standard instrument racks, stainless steel lab sink and counter. Printer racks, clide out keyboard trays at desk areas, cafe booth with underseat storage that folds into bed...

Land Based Mudlogging Unit - Interior
Land Based Mudlogging Unit - Interior

Front Interior View of Lab Area
Back Interior View of Lab Area
Interior View of Bunk Area

Offshore Mudlogging Unit - Exterior
Offshore Mudlogging Unit - Exterior

Skid-mounted 8' x 20' x 11' pressurized, purge system with alarms and safety shut off to meet NFPA 496 requirements for hazardous locations. Two roof mounted air conditioners step down power transformer 600 VA, LEL atmospheric monitor, lab sink work area,...

Offshore Mudlogging Unit - Interior
Offshore Mudlogging Unit - Interior

Front Interior View
Back Interior View

 
Download TMC Brochure (PDF 6,512KB)

Our customers rave about our products and services

Noble Energy utilized the Rig to Web System for 5 laterals in 2008. It was used to monitor drilling progress and mudlog data on a 24 hour basis and was instrumental in aiding the steering process input to the MWD operation. Data such as lithology description, mudlog gas shows ,ROP, GR, and conductivity probes( salinity increases) were presented on a real time basis to evaluate wellbore position and indicate possible

Noble Energy

recommendations or changes in steering the well path. Noble was impressed with the data presentation and accuracy of the Rig to Web System as well as its continuous data feed to the internet for instantaneous evaluation. Noble intends to continue its use for all future laterals.